Everipedia Logo
Everipedia is now IQ.wiki - Join the IQ Brainlist and our Discord for early access to editing on the new platform and to participate in the beta testing.
New Haven–Springfield Line

New Haven–Springfield Line

The New Haven–Springfield Line is a railroad line owned by Amtrak from New Haven, Connecticut, north to Springfield, Massachusetts. As a branch of the Northeast Corridor just north of New Haven State Street station, it is served by approximately seven daily Northeast Regional round trips, some continuing from New Haven to Washington, D.C., along the Corridor and others terminating at New Haven as shuttles. On weekends, there is one train daily to Roanoke, Virginia. It is also served by the daily Vermonter, which starts in Washington, D.C. and continues north from Springfield, finally terminating in St. Albans, Vermont.[2] The line is part of the Inland Route connecting Boston and New York via Hartford, Springfield, and Worcester, in contrast to the "Shore Line" along the Connecticut Shore and through Rhode Island.

In 2004, Congress added the New Haven–Springfield Line onto the Northern New England Corridor, one of ten federally designated corridors for potential high-speed rail service. Upgrades needed for higher-speed rail, including rebuilding portions of double tracking removed in the 1980s, were performed in preparation for the CTrail Hartford Line commuter service, which launched on June 16, 2018.[3]

New Haven–Springfield Line
Overview
TypeInter-city rail
SystemAmtrak
StatusOperating
LocaleConnecticut and Massachusetts
TerminiUnion Station, New Haven, Connecticut
Union Station, Springfield, Massachusetts
Stations9
Services
  • New Haven–Springfield Shuttle
  • Northeast Regional
  • Vermonter
  • Hartford Line
Operation
Opened1844
OwnerAmtrak
Operator(s)Amtrak, Connecticut Southern Railroad (freight)
Technical
Line length62 miles (100 km)
Number of tracks1–2
Track gauge4 ft 812 in(1,435 mm)standard gauge
Operating speedUp to 110 mph (180 km/h)[1]
Route map
*CSXto Boston
000
Springfield
Connecticut River Line
*CSX toChicago
Connecticut Southern RR
to Suffield
14.6 mi
23.5 km
Windsor Locks
19.1 mi
30.7 km
Windsor
to Manchester
Connecticut Southern RR
to Providence & Worcester RR
Central New England RR
25.3 mi
40.7 km
Hartford
Pan Am Southern
to Waterbury
35.9 mi
57.8 km
Berlin
43.3 mi
69.7 km
Meriden
55.6 mi
89.5 km
Wallingford
60.5 mi
97.4 km
Northeast Corridor
to Boston
61.4 mi
98.8 km
New Haven State Street
62 mi
100 km
New Haven Union Station
Northeast Corridor
to Washington, D.C.

History

The New Haven–Springfield Line was built by the Hartford and New Haven Railroad (H&NH) and began operations in 1844, forming the first all-rail route between Boston and New Haven, with steamship service on Long Island Sound completing service to New York. The Shore Line, today's Northeast Corridor, was completed in 1858, but the Springfield route continued to carry most traffic until the bridge over the Thames River at New London, Connecticut, opened in 1889.

The H&NH was merged into the New York, New Haven and Hartford Railroad (NYNH&H) in 1872, and the NYNH&H continued to operate regular service between New York City and Springfield over the line. Various services were also operated over the Inland Route, starting July 1, 1911 by agreement of the NYNH&H and the New York Central and Hudson River Railroad (lessee of the Boston and Albany Railroad). By the startup of Amtrak on May 1, 1971, the Inland Route was no longer in use, but frequent trains continued to serve the New Haven–Springfield Line.

On May 17, 1971, Amtrak added a train between Philadelphia and Boston via the Inland Route. With the November 14, 1971 timetable, this was assigned the name Bay State, and extended south from Philadelphia to Washington, DC. The train was discontinued March 1, 1975, though on October 31 of that year, the Boston section of the Lake Shore Limited began, restoring Springfield–Boston service.[4]

On April 1, 1976, Amtrak acquired the New Haven–Springfield Line from the newly formed Conrail, along with most of the Northeast Corridor, the Keystone Corridor, and several other lines.

During the mid-1980s, due to the high cost of operating the New Haven–Springfield Line and the competing newly-constructed expressways, Amtrak removed 25 miles (40 km) of track, turning the line from a double-track line to a line with a single track with passing sidings.[5][6] Of the 62 miles (100 km) between New Haven and Springfield, 23.3 miles (37.5 km) of double track and 38.7 miles (62.3 km) of single track were left.[7]

The final iteration of Inland Route service began with the November 10, 1996, timetable, with the extension of the daily Virginia Service train 85/86 to Boston via Springfield. That train was later truncated, and the former Washington–Boston Bay State was reinstated via the Inland Route.[8] By the October 28, 2002 schedule, trains 140 (weekend) and 142 (weekday) provided northbound Inland Route service, while the only weekend service was provided southbound via the 147. Train 142 was dropped October 27, 2003, and the November 1, 2004 timetable dropped 140 and 147, ending the use of the Inland Route.

On May 22, 2012, construction started on the CTfastrak busway between New Britain and Hartford in the northern two track slots between Hartford and Newington Junction.[9] The southern two track slots are used for the active double-track rail line. Any future re-addition of a third or fourth track would require removing or relocating the busway.

The connection between a new double track section from Hartford to Windsor and an existing section from north of Windsor to south of Windsor Locks was completed on September 25, 2018, leaving less than twelve miles (19 km) of single track on the line.[10][11] The new section was not expected to allow additional service, but to increase reliability.[10]

Interstate 84

One proposal to replace the aging Interstate 84 viaduct through Hartford as part of the I-84 Hartford Project is an at-grade roadbed, which would require relocating the rail tracks and busway north of the new road. The viaduct crosses the tracks and busway twice, a route dictated by the placement of abutting development back when the viaduct was constructed in the 1960s. Subsequent demolition has made the proposal to move the tracks a viable option to consider.[12]

Shuttles

Amtrak runs Shuttles between Springfield, Massachusetts, and New Haven, Connecticut. These trains connect with Northeast Regional or Metro-North New Haven Line service at New Haven's Union Station, usually by a cross-platform or same-track transfer. Shuttles are in the 400 series, with the last two digits usually denoting the number of the Amtrak train it is connecting to.[13][14]

Hartford Line

The Connecticut Department of Transportation (ConnDOT) and the Massachusetts Executive Office of Transportation studied adding a dedicated New Haven–Hartford–Springfield Commuter Rail Line between New Haven and Springfield to create a more accessible commuter connection to the Metro North commuter lines between New York City and Southwestern Connecticut, and also give more transit options to people commuting within the Knowledge Corridor region surrounding Hartford and Springfield. As part of this, extending or adding stations and right of way and new rail options were investigated. The study culminated in a final report in 2005, which was presented for a grant application to the Federal Transit Administration New Starts program.[15]

Construction added 27 miles (43 km) of double track[16][17] as well as 2 miles (3.2 km) of new passing sidings, leaving less than 12 miles (19 km) of single track.[11] Five new interlockings were built and new signal systems were installed, including the installation of Positive Train Control. Bridges and culverts on the line have been repaired, rehabilitated or replaced. Stations at Wallingford, Meriden, and Berlin were completely rebuilt, while New Haven State Street and Hartford had improvements made.[17]

New Hartford Line commuter rail service on the line began on June 16, 2018.[18] Expanded Amtrak Shuttle service on the line launched one week earlier on June 9, 2018.[19] Connecticut DOT provides eight round trip commuter trains on weekdays under its new CTrail branding that are operated by its new contractor, a joint venture between TransitAmerica Services and Alternate Concepts Inc.[20] Half of these trains operate between New Haven and Hartford, with the other four running the whole line between New Haven and Springfield.[21] Amtrak has added three new Shuttle round trips on top of its previous service. This brings the total round trips on the line to sixteen between New Haven and Hartford, with twelve of them operating along the full line to Springfield. On weekends and holidays, CTrail operates four New Haven–Hartford round trips and three New Haven–Springfield round trips. Amtrak continues to offer its existing weekend service with some minor schedule changes. Together, twelve–thirteen round trips are offered on weekends.[21]

Stations

The Springfield–New Haven corridor is served by some Northeast Regional trains in the 136 and 140 series. These trains run provide direct service from Springfield to Washington, D.C., without the need to change trains in New Haven. All other Northeast Regional trains continue on past New Haven to Boston South Station.

Milepost (km)[22]Station[23]LocationLine servicesConnections[14][23][24][25]
SHNRVTHF
0 mi (0 km)Springfield Union StationSpringfield, MAAmtrak: Lake Shore Limited
PVTA Bus: 1, 2, 3, 4, 5, 6, 7, 10, 11E, 12E, 14, 17, 20, 20E, 21, 21E, 92
14.6 mi (23.5 km)Windsor LocksWindsor Locks, CTCTtransit Hartford: 905W
19.1 mi (30.7 km)WindsorWindsor, CTCTtransit Hartford: 32, 34, 36
25.3 mi (40.7 km)Hartford Union StationHartford, CTCTtransit Hartford: 30, 60, 62, 64, 66, 72, 74, 76, 82, 83, 84, 901, 903, 904, 905, 906, 907, 910, 913, 914, 918, 921, 950, Dash
CTfastrak: 101, 102, 128, 923, 924, 925, 928
35.9 mi (57.8 km)BerlinBerlin, CTCTtransit New Britain: 512
43.3 mi (69.7 km)Meriden Transit CenterMeriden, CTCTtransit Hartford: 919
CTtransit New Haven: 215M
CTtransit Meriden: 561, 563, 564, 565, 566
Middletown Area Transit: M-Link
49.0 mi (78.9 km)WallingfordWallingford, CTCT Transit New Haven: 215M, 215W
CTtransit Wallingford: 292
61.4 mi (98.8 km)State StreetNew Haven, CTCTrail: Shore Line East
Metro-North Railroad: New Haven Line
CTtransit New Haven: 204, 206, 212, 223, 274, 278
62.0 mi (99.8 km)Union StationAmtrak: Acela Express, Northeast Regional (to Boston)
CTrail: Shore Line East
Metro-North Railroad: New Haven Line
CTtransit New Haven: 271, 272, 278, 950, Union Station Shuttle
Megabus, Greyhound Lines, Peter Pan Bus Lines, Yale University Shuttle

References

[1]
Citation Linkwww.ct.gov"AMTRAK RUNS TEST TRAINS OF UP TO 110 MPH IN PREPARATION FOR THE LAUNCH OF THE HARTFORD LINE ON JUNE 16" (Press release). Connecticut Department of Transportation. June 6, 2018. Retrieved June 17, 2018.
Sep 29, 2019, 9:56 PM
[2]
Citation Linkwww.masslive.com"First passenger train in a generation stops at Northampton as new Amtrak service begins".
Sep 29, 2019, 9:56 PM
[3]
Citation Linkwww.courant.comPorter, Mikaela; Owens, David (June 17, 2018). "Thousands Take A Free Ride On Hartford Line's Inaugural Run". Hartford Courant. Retrieved June 17, 2018.
Sep 29, 2019, 9:56 PM
[4]
Citation Linkallaboardohio.orgWicker, Tom (October 31, 2015). "Amtrak's Lake Shore Ltd turns 40!". All Aboard Ohio. Retrieved April 9, 2018.
Sep 29, 2019, 9:56 PM
[5]
Citation Linkwww.nhhsrail.com"Objectives & Scope". New Haven–Hartford–Springfield Rail Program. Connecticut Department of Transportation. Retrieved July 1, 2018.
Sep 29, 2019, 9:56 PM
[6]
Citation Linkopenlibrary.orgKarr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. p. 78. ISBN 0942147022.
Sep 29, 2019, 9:56 PM
[7]
Citation Linkwww.apta.com"Connecticut: New Travel Options for the Northeast Region" (PDF). SPEEDLINES. No. 23. High-Speed Intercity Passenger Rail Committee. June 2018. p. 20. Retrieved July 1, 2018.
Sep 29, 2019, 9:56 PM
[8]
Citation Linkopenlibrary.orgKush, Bronislaus B (December 28, 1996). "Amtrak says: Riders wanted; Lack of support may derail trains". Telegram & Gazette. p. A1.
Sep 29, 2019, 9:56 PM
[9]
Citation Linkarticles.courant.com"Busway: After More Than 12 Years, Work Starts In Earnest On Busway". Hartford Courant.
Sep 29, 2019, 9:56 PM
[10]
Citation Linkwww.courant.comLurye, Rebecca (June 12, 2018). "Despite New Commuter Line, Rail Upgrades Lag North Of Hartford". Hartford Courant. Retrieved September 25, 2018.
Sep 29, 2019, 9:56 PM
[11]
Citation Linkwww.ct.gov"CTDOT ANNOUNCES COMPLETION OF A SECOND RAIL TRACK ON THE CTrail HARTFORD LINE BETWEEN HARTFORD AND WINDSOR" (Press release). Connecticut Department of Transportation. September 25, 2018. Retrieved September 25, 2018.
Sep 29, 2019, 9:56 PM
[12]
Citation Linki84hartford.com"Alternatives Analysis". I-84 Hartford Project. Connecticut Department of Transportation. Retrieved January 4, 2018.
Sep 29, 2019, 9:56 PM
[13]
Citation Linkwww.hartfordline.com"CTrail Hartford Line Schedules: Effective April 14, 2019" (PDF). Hartford Line. April 14, 2019. Retrieved May 20, 2019.
Sep 29, 2019, 9:56 PM
[14]
Citation Linkwww.amtrak.com"Northeast Corridor Boston/Springfield–Washington Timetable" (PDF). Amtrak. April 4, 2019. Retrieved May 20, 2019.
Sep 29, 2019, 9:56 PM
[15]
Citation Linkwww.ct.gov"New Haven Hartford Springfield Commuter Rail Implementation Study: Recommended Action" (PDF). Connecticut Department of Transportation. Retrieved April 9, 2018.
Sep 29, 2019, 9:56 PM
[16]
Citation Linkwww.nhhsrail.com"Winter 2018 Newsletter" (PDF). NHHS Rail Program. January 17, 2018. Retrieved January 17, 2018.
Sep 29, 2019, 9:56 PM
[17]
Citation Linkhartfordline.com"What the Hartford Line Brings to Customers". Hartford Line. 2018. Retrieved May 19, 2018.
Sep 29, 2019, 9:56 PM
[18]
Citation Linkwww.courant.comPorter, Mikaela; Owens, David (June 17, 2018). "Thousands Take A Free Ride On Hartford Line's Inaugural Run". Retrieved June 18, 2018.
Sep 29, 2019, 9:56 PM
[19]
Citation Linkwww.progressiverailroading.com"Connecticut DOT gears up for Hartford Line testing". June 6, 2018. Retrieved June 6, 2017.
Sep 29, 2019, 9:56 PM
[20]
Citation Linkportal.ct.gov"Gov. Malloy Announces TransitAmerica Services and Alternate Concepts Selected as Service Provider for the Hartford Line". The Office of Governor Dannel P. Malloy. Connecticut DOT. Retrieved July 24, 2017.
Sep 29, 2019, 9:56 PM