Everipedia Logo
Everipedia is now IQ.wiki - Join the IQ Brainlist and our Discord for early access to editing on the new platform and to participate in the beta testing.
Athens–Piraeus Electric Railways

Athens–Piraeus Electric Railways

I.S.A.P. or Athens–Piraeus Electric Railways (Greek: Η.Σ.Α.Π., Ηλεκτρικοί Σιδηρόδρομοι Αθηνών-Πειραιώς, Ilektrikoi Sidirodromoi Athinon-Pireos) was the oldest urban rapid transit system of Athens metropolitan area in Greece. Opened as a suburban railway line connecting Athens with the nearby major port city of Piraeus, it was gradually converted to full rapid transit operations, making it one of the oldest metro lines in the world. The current line evolved from the older Athens & Piraeus Railway and Lavrion Square-Strofyli railway.

In June 2011 ISAP was absorbed by a new transport company, STASY S.A.

Athens-Piraeus Electric Railways S.A.
Former type
S.A. (corporation)
IndustryRailway
FateAbsorbed by STASY S.A. (2011)
PredecessorHellenic Electric Railways (ΕΗΣ)
SuccessorSTASY S.A.
Founded1976
Defunct2011
Headquarters
Athens
,
Greece
Area served
Athens urban area
ServicesRailway Athens-Piraeus-Kifissia
Number of employees
1003 (May 2011)
ParentOASA S.A.
Websitehttp://www.isap.gr [16]
imgimgimgimg

History

Athens and Piraeus Railway

The line from Piraeus to Thision was inaugurated on February 27, 1869 as a steam train connecting Athens and its port, Piraeus, and was operated by Athens & Piraeus Railway Co (Greek: Σιδηρόδρομος Αθηνών-Πειραιώς or Greek: Σ.Α.Π.). The project was considered important, so Queen Olga and the Prime Minister Thrasyvoulos Zaimis attended the inauguration ceremony. There were 8 trains in each direction daily and 9 trains in each direction on Sundays.

In 1874 the Athens & Piraeus Railway Company was bought by the Bank of Industrial Credit (Greek: Τράπεζα Βιομηχανικής Πίστεως). Under the new ownership the railway procured additional rolling stock. Soon the line was extended to Omonoia Square with an underground section constructed with the cut-and-cover method.

The line was electrified in 1904 using the 600 V DC, third rail, top contact system (today increased to 750 V DC) by Thomson Houston.

Hellenic Electric Railways Company

A 1925 season ticket of SAP

A 1925 season ticket of SAP

In 1926 the operating company was bought by the Power and Traction Finance Ltd and renamed Ellinikoi Ilektrikoi Sidirodromoi (E.I.S., Greek: Ελληνικοί Ηλεκτρικοί Σιδηρόδρόμοι or Greek: Ε.Η.Σ., translated as Hellenic Electric Railways).[1] In 1926 the sister company Ilektriki Etaireia Metaforon or H.E.M., also part of Power Group, took over the 1,000 mm (3 ft 3 3⁄8 in) metre gauge Lavrion Square-Strofyli railway. This line was eventually converted to standard gauge, double track and became an extension of the existing line, reaching Attiki in 1948 and Kifissia in 1958.

Athens-Piraeus Electric Railways

In 1976 E.I.S. was nationalized and renamed Athens-Piraeus Electric Railways S.A. (I.S.A.P).[2]

A merger of ISAP with Athens Metro was dictated by Law 2668,[3] however it was postponed indefinitely and the required Presidential Decree was never issued. In January 2011 the Greek Government announced their plans to merge ISAP with Attiko Metro Etaireia Leitourgias S.A., the company which operates Athens Metro lines 2,3, and with Athens Tram in a single new company.[4]

In March 2011, the Greek Government passed Law 3920[5] to allow ISAP and Athens Tram to be absorbed by Athens Metro Operations Company (AMEL). The new company created from the mergers is named "STASY S.A." (Greek: ΣΤΑΣΥ Α.Ε.) and is a subsidiary of OASA S.A. The merger was officially announced on June 10, 2011,.[6]

STASY is based at the former ISAP head offices, near Omonoia Square in Athens. Kostas Vassiliadis, a former chief engineer (1976-1991) and later CEO of ISAP between 1997 and 2000 became Chairman and CEO of the merged company until the end of 2012

Network and stations

Network

Today ISAP's sole line connects the port of Piraeus with the northern suburb of Kifissia. As it was originally designed for steam traction, the line runs mostly above ground. However, there are no level crossings. It is built to 1,435 mm (4 ft 8 1⁄2 in) standard gauge and is electrified using the 750 V DC (originally 600 V DC), third rail, top contact system, also used by Athens Metro Lines 2 and 3. The two systems (ISAP and Metro Line 2) have a physical connection at Attiki station.

From Piraeus the line runs eastwards to Neo Faliro and then north to Thision, approximately parallel to the main road connecting Athens and Piraeus. Between Monastiraki and Attiki the line runs underground. At Monastiraki passengers can change to Metro line 3 and at Omonoia and Attiki to Metro line 2. From Attiki the line continues north, following the alignment of the old "Attica Railways" through Patissia, the suburbs of Nea Ionia, Irakleio, Marousi and terminates at Kifissia. At Nerantziotissa passengers can change to the suburban line serving Athens International Airport.

Stations

  • Piraeus, next to the port, is the southernmost station of ISAP. The Electric Railways Museum of Piraeus, a small museum of urban transport (ISAP and former tram lines) is located in the station, at the former Post Office. A train depot and rolling stock repair facilities are located next to the station. Part of the station and most adjacent engine sheds and works were destroyed by Allied bombing during World War II, on January 11, 1944.

  • Faliro, near Faliro Coastal Zone Olympic Complex (Peace and Friendship Stadium and Karaiskákis Stadium) and close to a terminal of Athens Tram S.E.F. (Σ.E.Φ.) The station includes a rolling stock depot.

  • Moschato

  • Kallithea

  • Tavros, with a train reversing siding.

  • Petralona

  • Thiseio - The original terminus of the line when it opened in 1869. Next to the passenger station there is a train depot and the permanent way maintenance department, with some specialized departmental rolling stock.

  • Monastiraki, passenger interchange with Athens Metro Line 3.

  • Omonoia, passenger interchange with Athens Metro Line 2.

  • Victoria

  • Attiki, passenger interchange with Athens Metro Line 2. At this station there is also a small depot and the railway connection with the Athens Metro system.

  • Agios Nikolaos

  • Kato Patissia

  • Agios Eleftherios

  • Ano Patissia, with a train reversing siding.

  • Perissos

  • Pefkakia

  • Nea Ionia, with a train reversing siding.

  • Heraklio, with a train reversing siding.

  • Eirini, near the Athens Olympic Stadium. The signalling and control center for the ISAP line and a train washing facility are located next to the station.

  • Nerantziotissa, passenger interchange with the Proastiakos suburban services.Also the Mall Athens is accessible from the station.

  • Maroussi

  • KAT, near the KAT Hospital

  • Kifissia, the northernmost terminus.

Rolling stock

Steam locomotives

In the early period (1869–1904) the railway used 22 steam tank locomotives of about 6 different types. The majority were of 2-4-0T configuration, made in the United Kingdom by Hudswell Clarke and Sharp Stewart.[7] After electrification, some the steam locomotives were sold to the Hellenic State Railways (SEK).[8]

Table of steam locomotives[[CITE|9|https://openlibrary.org/search?q=%2C%20pp.%C2%A050%E2%80%9352.]]
Name(s)TypeQuantityManufacturerSerial Nos.YearNotes
Constantine0-6-0T1Hudswell Clarke1868
Olga, George2-4-0T2Hudswell Clarke1868
0-4-2T1Neilson & Co.1866
2-4-0T1Sharp Stewartc.1878
2-4-0T6Sharp Stewart / Hudswell Clarke1879–1884
2-4-0T2Sharp Stewart1892
Marina0-6-0ST1Manning Wardle1892to SEK 51, class Δα (1st)
4-4-0T2Neilson & Co.1892to SEK 301–302, later 21–22, class Γα
0-4-2T3Saint-Léonard1896

First generation EMUs

Since electrification (1904) the railway used almost exclusively electric multiple unit (EMU) trains. The vehicles are classified in batches (or deliveries). The first four batches consisted of wooden passenger cars on iron or steel frames. Currently only a short train of two wooden railcars is preserved, modified with the addition of Scharfenberg couplers at each end and is displayed during special events.

BatchYearDescriptionPhotograph
1stLocomotive hauled stock
2nd190440 railcars (20 DM and 20 T) made by Thomson Houston/Desouches David & Cie. Withdrawn in 1985.Piraeus-Athens Electric Railway terminal.jpg
3rd19149 railcars made by Baume et Marpent/Desouches David & Cie. Withdrawn in 1985.
4th192312 railcars of the Baume et Marpent design, built at Piraeus Works. Withdrawn 1985.
1947–1948Rebuilding and modernization of damaged rolling stock

The first generation rolling stock was numbered as in the following table:[10]

Markingnumbertype
A1 to A1111DT
Γ417 to Γ42711DT
F410 to F41818T
B601 to B62121DM
Total61

Second generation EMUs

The fifth (1951), sixth (1958) and seventh (1968) batches were of steel construction, made by Siemens-MAN. At the same time Scharfenberg couplers were introduced.

BatchYearConfigurationTypeNumberingDescriptionPhotograph
5th1951DM-DT or
DM-DTL
DM901-91224 railcars, in 12 EMU-2 trains. Withdrawn in 1995.
DTL701-706
DT801-806
6th1958DM-DT or
DM-DTL
DM913-92832 railcars, in 16 EMU-2 trains. Withdrawn in 2003-2004.Piraeus Underground Station 1981b.jpg
DTL707-714
DT807-814
7th1968–1969DM-DT or
DM-DTL
DM929-93718 railcars, in 8 EMU-2 trains. Some rearranged in EMU-5 trains. Withdrawn in 2003-2004.
DTL715-718
DT815-819

Third generation EMUs

Currently ISAP uses only modern trains of batches 8, 10 and 11.[11] Batch 8 (1983–1985) consists of five-car trains made by Siemens-MAN. Trains of batch 9 were made by LEW in the German Democratic Republic and have been withdrawn. The trains of the 10th batch (1994), similar to those of the 8th batch, were built by Hellenic Shipyards S.A. using Simenes-MAN design and mechanical parts. The 11th batch (2002) trains, with three phase AC motors were also constructed by Hellenic Shipyards S.A. using ADtranz-Siemens design and mechanical parts.

BatchYearConfigurationTypeNumberingDescriptionPhotograph
8th1983–1985DM-T-DM+DT-DMDM101-14575 railcars made by MAN/Siemens, originally delivered as 4-car sets (M-M-M-M), and then trailers added to lengthen the trains to EMU-5 sets.ISAP Thision sidings.jpg
T201-215
DT301-315
9th1983–1985DM-M+M-DMDM1101–112550 railcars made of aluminium LEW (type GIII) in EMU-4 sets later rearranged in EMU-6 (DM-M+M-DM+M-DM). In limited use after 1999 and all withdrawn until 2004.ISAP LEW GIII.jpg
M2201–2225
10th1993–1995DM-T-DM+DT-DMDM146-17550 railcars made by MAN-AEG/Siemens-Hellenic Shipyards in EMU-5 sets.
T216-225
DT316-325
11th2000–2004DM-T-DM+DM-T-DMDM3101-3180120 railcars coupled in 20 EMU-6 trains. Made by ADtranz-Siemens-Hellenic Shipyards. Nine railcars were destroyed by terrorists at Kifissia station on 2009-03-02.[12]20070523-NERATZIOTISA.jpg
T3201-3240

Other rolling stock

Freight railcar 41

Freight railcar 41

In 1904 two electric locomotives, numbered 20 and 21, were bought from Thomson-Houston.

In 1911 the railway bought from Goossens two steeple-cab electric locomotives (numbered 31 and 32) and a self-propelled electric freight railcar (41), capable of operating from third rail or overhead line. These could operate over the Piraeus Harbour tramway, the Piraeus-Perama light railway as well as on the mainline to Thision and Omonoia. Freight railcar 41 was used initially to carry bags of transcontinental mail unloaded from passenger liners in Piraeus. Locomotive 32 is still in use, with the overhead collector removed.

In addition the railway owns a road-rail Unimog car and a ballast tamper.

During 1981-1984 ISAP leased six four-car, bright yellow trains of narrow loading gauge (type G-I or Gisela) from East Berlin's metro.

In the early 1980s consideration was given to the purchase of 60 secondhand cars of London Underground R Stock, built between 1938 and 1959, but ultimately no deal was made and new carriages were purchased instead.[13]

Piraeus rolling stock works

The Royal Saloon (1888)

The Royal Saloon (1888)

Athens & Piraeus Railway, in common with most railways of the steam era, had its own rolling stock heavy maintenance works, located next to Piraeus station. In 1926 this became property of E.I.S. In addition to maintenance, repair and rebuilding, Piraeus works constructed a significant number of railway cars, mostly between 1880 and 1960. The most significant projects were the construction of 12 electric rail cars in 1923 and the rebuilding of rolling stock destroyed by allied bombing in 1944.[14] Another noteworthy project was the construction of a small number of electric trams, based on a Dick Kerr model (1939).

An excellent example of the technical skill available at Piraeus works is the Royal Saloon (1888), a present to King George I of Greece. This luxurious vehicle was much admired and it was exhibited at the 1888 "Olympia Fair" (First Athens International Exhibition) held in Zappeion. The Royal Saloon survives to date, and is exhibited in the Railway Museum of Athens.

Proposed northern extension

An extension to the north was under consideration that would have been built in two phases, reaching Nea Erithrea by the end of the first phase and Agios Stefanos by the end of the second phase. Due to lack of funding, this extension was canceled in 2011.

References

[1]
Citation Linkopenlibrary.orgS.A.P./E.I.S. also constructed and operated the Piraeus Harbour Tramway (1908-1960) and the Piraeus-Perama light railway (1936-1977). These were also standard gauge and were used by freight and service S.A.P./E.I.S. trains.
Sep 21, 2019, 4:29 AM
[2]
Citation Linkopenlibrary.orgLaw 352 (Gazette Vol A, issue 147, 16 June 1976)
Sep 21, 2019, 4:29 AM
[3]
Citation Linkopenlibrary.orgLaw 2669/1988, Government Gazette Issue A 283/1998-12-18, Part 7, paragraphs 3 and 4.
Sep 21, 2019, 4:29 AM
[4]
Citation Linkwww.naftemporiki.gr«Πράσινο» στο νομοσχέδιο για τις αστικές συγκοινωνίες Naftemporiki Newspaper, 2011-01-12.
Sep 21, 2019, 4:29 AM
[5]
Citation Linkopenlibrary.orgLaw 3920, Government Gazette issue A-33, 2011-03-03.
Sep 21, 2019, 4:29 AM
[6]
Citation Linkopenlibrary.orgMinisterial Decision 28737/2637, Government Gazette issue B-1454, 2011-06-17
Sep 21, 2019, 4:29 AM
[7]
Citation Linkopenlibrary.orgZartaloudis, I.; Karatolos, D.; Koutelidis, D.; Nathenas, G.; Fasoulas, S.; Filippoupolitis, A. (1997). Οι Ελληνικοί Σιδηρόδρομοι (Hellenic Railways) (in Greek). Μίλητος (Militos). pp. 22–37. ISBN 960-8460-07-7., p. 29.
Sep 21, 2019, 4:29 AM
[8]
Citation Linkopenlibrary.orgDurrant, A. E. (1972) [1966]. The Steam Locomotives of Eastern Europe. Newton Abbot, Devon, UK: David and Charles. ISBN 0-7153-4077-8., p. 51.
Sep 21, 2019, 4:29 AM
[9]
Citation Linkopenlibrary.org, pp. 50–52.
Sep 21, 2019, 4:29 AM
[10]
Citation Linkopenlibrary.orgNathenas, G.; Kourbelis, A.; Vlastos, T.; Kourouzidis, S.; Katsareas, V.; Karamanis, P.; Klonos, A.; Kokkinos, N. (2007). Από τα Παμφορεία στο Μετρό (in Greek). 2. Athens: Μίλητος (Militos). ISBN 978-960-8460-91-1., p. 616.
Sep 21, 2019, 4:29 AM
[11]
Citation Linkwww.isap.gr"ISAP vehicles - general information". Archived from the original on 2009-11-23. Retrieved 2009-10-08.
Sep 21, 2019, 4:29 AM
[12]
Citation Linkwww.imerisia.gr"Εμπρησμός σε βαγόνια του ΗΣΑΠ". HMERHSIA (IMERISIA) newspaper. 2009-03-03.
Sep 21, 2019, 4:29 AM
[13]
Citation Linkopenlibrary.orgConnor, Piers (1983). The 'R' Stock Story. Hemel Hempstead: London Underground Railway Society. p. 60. ISBN 0-9508793-0-4.
Sep 21, 2019, 4:29 AM
[14]
Citation Linkopenlibrary.org130 Χρόνια Ηλεκτρικοί Σιδηρόδρομοι Αθηνών-Πειραιώς Α.Ε. (130 years of Athens-Piraeus electric railways). ISAP. 1999–2005. pp. 59, 132, 133. ISBN 960-86477-0-3.
Sep 21, 2019, 4:29 AM
[15]
Citation Linkwww.isap.grhttp://www.isap.gr/
Sep 21, 2019, 4:29 AM
[16]
Citation Linkwww.isap.grhttp://www.isap.gr
Sep 21, 2019, 4:29 AM
[17]
Citation Linkwww.naftemporiki.gr«Πράσινο» στο νομοσχέδιο για τις αστικές συγκοινωνίες
Sep 21, 2019, 4:29 AM
[18]
Citation Linkweb.archive.org"ISAP vehicles - general information"
Sep 21, 2019, 4:29 AM
[19]
Citation Linkwww.isap.grthe original
Sep 21, 2019, 4:29 AM
[20]
Citation Linkwww.imerisia.gr"Εμπρησμός σε βαγόνια του ΗΣΑΠ"
Sep 21, 2019, 4:29 AM